FAQ – Click on Superflow 360 Drain manual for complete instructions
We recommend calling your pool builder or a pool professional
This is a job for a professional pool tech drained in drain safety to make sure your pool drain remains VGB compliant. They will need to blow the drain line backwards with Compressed air or a pump discharge of 50 to 60 GPM. A diver may also be needed to remove the top of the drain to allow all the debris to be removed.
Paramount drain covers MDX-R3, SDX2, Buzztop, and MDX2 (the part exposed to UV rays) and threaded fasteners must be replaced every 5 years form installed date or whatever date is engraved on the cover.
- If your pool was built before 2009, it may have a drain(s) that is not compliant with the VGB Pool and Spa Safety Act (new national law concerning drain safety), and it must be replaced if you remodel the pool.In-floor cleaning systems remove debris they sweep up through the drain and must have an approved VGB debris accepting drain installed. Your pool refinish company must call Paramount before starting to find out which of these drains will work on your pool. In most cases some amount of demolition will be required. Paramount 800-621-5886.
- All nozzles in the pool are specific to the body they are in and must be removed and marked so they are replaced in the proper body.
- Plaster caps to protect the bodies and lines for the in-floor system are available and need to be used prior to start of demolition thru the refinishing process. The refinish company should call Paramount 800-621-5886.
Drain suction is dangerous and if the drain cover is tampered with or not installed properly the outlets may become unsafe and not in compliance. The safety screws are to discourage un-trained people from working on them.
On a pump with the main drain and one or more skimmer line(s), the skimmer(s) can only have one skimmer open at a time and it must be reduced to 1/3 of the way open otherwise the GPM pulled through the main drain will be so small that debris can be caught in it and will build up until the line is partially to fully blocked.